Town Hall Meeting # 1 October 9, 2008
(Notes taken by Sue Haines)
Strategic parish Data
Technical Support
Useful Parish Information
Facility Requirements
Functioning Requirements (* most votes)
All input is important!
‘green’ buildings (ecologically compatible)
Next Town Hall meeting is a continuation, not a repeat!
CHURCH ( not listed in order of importance or priority)
| * Tabernacle / altar |
|
|
|
covered drop off |
| Baptismal Font |
|
|
|
balcony seating |
| bell Tower with bells |
|
|
|
handicap accessible / elevator |
| railing at sanctuary |
|
|
|
OCIA space |
| center aisle |
|
|
|
adequate parking / outside lighting |
| Reconciliation room |
|
|
|
assembly partitions |
| vestibule (Narthex) / gathering space before Mass |
children's Liturgy room |
| soundproof cry room |
|
|
|
mail room / parish offices |
| choir & music area / choir loft |
|
|
kitchenette |
| orchestra pit |
|
|
|
reading room |
| Stations of the Cross |
|
|
|
good acoustics / AV |
| *Chapel / Perpetual Adoration |
|
|
double face sign / signage |
| Altar server room |
|
|
|
outside Easter Vigil fire pit |
| Cross |
|
|
|
|
landscaping |
| rest rooms / showers / family rest room |
|
|
|
* Mary garden |
| reception/ hospitality room |
|
|
courtyard / labyrinth |
| pipe organ |
|
|
|
|
gift shop |
| nursery |
|
|
|
|
hearing impaired section |
| bridal room |
|
|
|
stained glass |
| wake room |
|
|
|
drop vault |
| storage rooms / cedar closet |
|
|
wood beams |
| electrical room / floor outlets |
|
|
emergency audible system / First Aid station |
| a/c room |
|
|
|
|
covered walkways |
| granite flooring |
|
|
|
CRHP space |
| janitor closet / maintenance storage |
|
|
| Special needs room / cry rooms |
|
|
|
MASTER SITE PLAN
Develop and write a program based on parish input! By consensus – gathering information – majority votes; 3-4 years for new church; return for comments & input
MULTIPURPOSE BUILDING ( Parish Life Center)
| commercial kitchen w/ prep areas |
|
gymnasium w/flexible partitions |
| school cafeteria for 600 |
|
|
storage |
| meeting rooms (sound proof walls) |
|
nursery |
| classrooms |
|
|
|
maintenance / housekeeping |
| controlled a/c |
|
|
conference room |
| bathrooms w/showers / locker rooms |
|
youth area |
| AV storage room (sound & light) |
|
trophy display area |
| food pantry (SVDP) and Storage |
|
nurse/First Aid station |
| gift shop |
|
|
|
flexible rooms |
| Religious Ed classrooms |
|
|
storage for tables & chairs |
| administration / RE Offices (or in church bldg) |
|
Town Hall Meeting # 2 October 23, 2008
(Notes taken by Nancy Slade)
Fr. Bill welcomed everyone and opened with a prayer. He introduced:
- Tom Doyle, Parish Manager
- Doug Tam, Development & Stewardship Director
- Parish Council Members
- Tim Donahue, Building Committee Chairman
- Building Committee Members
- Rick, architect from the diocese
- Chris, construction rep and friend of Fr. Bill
- Rick Swisher, architect (and his assistant Steve)
Rick Swisher - Gathering information is important to the whole process; we want to hear from everyone. He presented the following slides:
- Our Mission Statement
- Peace Truth Listen
- Old site plan (34-40 acres)
- Original master plan approved August 8, 2000
Almost a decade later things have changed. Our parish has grown, with new requirements. The 1300 seat church originally planned for in not sufficient to meet our needs now. We are looking at a 2,000 seat church.
- Master Plan Phasing
Phase 0 -Completed
Phase I -Church seats 2,000
- Parish Center with Cafeteria for 200 +
-Meeting room with reception for 500
-Maintenance and Infrastructure (storage)
Phase II - Family Life Center with Gym
- Offices
Phase III - Ministries of Mercy Center
- Improve sports fields
Phase IV - Early Childhood Center
Phase V - Middle School
- Rectory
Phase VI - ‘Higgins’ Hall
- Assisted living facility
- Sample revised site plan by Rick Swisher (also handed out at sign-in)
- Photos of current site
We divided up into groups, with an enlarged copy of the current site, cutouts of proposed building, and markers, and were asked to take some time arranging the buildings on the site, keeping in mind we need 600 parking spaces for the church, and 100-150 more for the balance of the property (in addition to what us now there). A spokesperson from each group presented their result.
Rick Swisher – Master plan will be modified, taking into consideration all of these plans, then will be discussed among the building committee before going forth to the county. At the next Town Hall Meeting on November 6 th, we will see photos of several churches (some that Rich designed) and we’ll discuss interior and exterior styles. If anyone has any photos of churches, they can send them to Rick, or the church office.
Fr. Bill thanked everyone for coming and closed with a prayer.